Teréga
Trifyl

Gas transport

Trifyl

2018 - 2022

Initiated in 2014, the Trifyl Horizon 2020 project involves reinventing the management and recovery of waste, aiming at local biomethane production, which will be able to cover up to 10% of the department’s domestic gas needs.

Injecting this locally produced green gas, Teréga establishes as an ambitious actor in energy transition. Teréga is responsible for connecting the methanisation station to the transport grid.

Teréga - MAKE GAS AN ACCELERATOR FUTURE

Project's objectives

Installation

Installation of an injection station on the Trifyl methanisation site.

Construction

Construction of a 4.85 km pipeline between the Teréga grid and Trifyl with a nominal diameter of 160 mm

Construction

Construction of a compression unit at Teréga’s existing cut-off station