Urgence gaz 0 800 028 800

Du 24 août au 7 septembre 2026
Narbonne (11) and Sigean (11)
The alignment of the PLU (Plan Local d'Urbanisme - Local Urban Plan) is required for the natural gas transmission pipeline construction project ("Narbonne-Claira" project) carried out by Teréga.
The route of the future pipeline crosses "classified wooded areas" within the municipalities of Narbonne (11) and Sigean (11). To ensure the project complies with the PLU, it is necessary to modify the zoning of the classified wooded area along the future facility.
This compliance procedure is subject to a public consultation under the Urban Planning Code. It will take place from August 24, 2026, to September 7, 2026.
MEANS OF EXPRESSIONS
A consultation file will be available to the public throughout the process:
In paper version
In digital version on the website: https://www.terega.fr/en/project/narbonne-claira/
To learn more about the project, you can read the explanatory notices and the PLU compliance files available below:
For the municipality of Narbonne (11)
For the municipality of Sigean (11)
johan.gaillet@terega.fr, Project Manager